Hello,
I need a critical review of a project and produce a Reflective case study report.
The project to analyze is :The 2012 Olympics Infrastructure, and have to outline with factors contributed to effective project management and which were absent. Make recommendations too.
The word limit is 3000, (-/+ 10 %) , with Harvard references.
The report need to have Table of Contents, 20 references from books and academic articles. In the appendix to include a Pestle analysis.
Follow the structure from the files included.
Thank you.